SERVICES KINGDOM PROVIDED FOR OGILVIE CONSTRUCTION


CCTV protection of the full site including the perimeter, cabins, plant machinery and the structures as they progressed. The CCTV service was fully monitored and backed up by our mobile response service. A Time- Lapse camera was also installed to capture the progress of the build.


CHALLENGES FACED WHEN SETTING UP THE CONTRACT


The site was situated in the town centre of Hamilton. The area is built up residential/commercial area with a lot of footfall and potential for theft or damage.

At the beginning of the contract the site had no source of power.

As the development progressed, the site layout changed frequently.


THE ACTIONS AND SOLUTIONS WE PUT IN PLACE TO RESOLVE THIS

 

During the initial site survey our engineers determined that due to the location, the site was at high risk of interference and recommended the site was protected from the commencement of the development works.

Our first installation on site saw our engineers install a Self Powered Ai Eco-Tower at the groundworks stage of the development. This gave the full site 360 degree protection and a detection area spanning one hundred and forty metres. The Self Powered function solved our lack of mains electricity until the site compound was set up.

When mains power became available the engineers installed a robust Ai Fixed System. The fixed system incorporated 8 cameras which provided coverage to the full perimeter of the site. Battery operated RSI cameras were utilised on the scaffolding.

Quarterly reviews were undertaken and as the development progressed the system was adapted as required.

The client was issued with a remote login facility for the camera system on site, providing access to live footage as well as stored recordings.


THE OUTCOMES OF OUR ACTIONS AND HOW THIS BENEFITTED THE CUSTOMER


The site remained fully secured and totally covered throughout the duration of the development, resulting in peace of mind for the client and site management team.


TESTIMONIAL


Stewart Matthew, Site Manager of the development stated at the end of the end of the contract:

"Kingdom monitored Hamilton Premier Inn brilliantly and the team were very accommodating during the build."


KEY STATISTICS


7 Intrusions detected and prevented from escalating to a more serious outcome.